LEXUS RX 300

1998-2003 of release

Repair and car operation



Лексус RX 300
+ Cars Lexus RX-300
+ Controls and operation receptions
+ Options and car routine maintenance
+ The engine
+ Systems of cooling of the engine, heating, ventilation and air conditioning
+ The power supply system and release of the fulfilled gases
+ Systems of an electric equipment of the engine
+ Automatic transmission and interaxal differential
+ Трансмиссионная a line
+ Brake system
- Suspension bracket and steering
   The general information
   + Forward suspension bracket
   + Back suspension bracket
   - Steering
      Checks of components of a steering
      Removal, installation, dismantling and assemblage of a steering column
      Removal and installation of pump GUR and it приводного a belt
      Removal, installation, dismantling and assemblage of the steering mechanism
   + Suspension bracket geometry
+ Body
+ Onboard electric equipment
+ Basic schemes of electric connections




Removal and installation of pump GUR and it приводного a belt

Components of installation of pump GUR

1 — Приводной a belt
2 — the Socket
3 — the Gauge of pressure of liquid ГУР
4 — the Delivery tube
5 — Штуцерный a bolt

6 — the Lining
7 — the Returnable hose
8 — the Clamp
9 — pump GUR Assemblage

Pump GUR assemblage

1 — the Pressure head union
2 — the Sealing ring
3 — the Valve of management of a stream of liquid ГУР
4 — the Soaking up union
5 — the Spring
6 — the Lining
7 — Back section of the case
8 — the Back arm
9 — Forward section of the case
10 — the Forward arm

11 — a pump Pulley
12 — a pump Shaft
13 — the Lock ring
14 — the Epiploon
15 — a pump Rotor
16 — pump Plates (шиберы)
17 — the Pin
18 — Эксцентриковое a ring
19 — the Lateral rack
20 — the Wavy washer


 PERFORMANCE ORDER

  1. Remove a collar and disconnect a returnable hose, trying not to spill liquid ГУР on приводной a belt.
  2. Separate a socket and remove with штуцерного a bolt the gauge of pressure of liquid ГУР.

Do not drop the gauge since otherwise it is necessary to replace it.

  1. Remove штуцерный a bolt with a lining and disconnect a delivery tube.
  1. By means of the special adaptation give two bolts and remove приводной a belt.
  1. Ослабьте a bolt «A» so that it was possible to remove pump assemblage. Then completely turn out a bolt «B» and remove pump assemblage.

Bolt «A» to turn out it is impossible.

  1. In need of pump repair its dismantling is made according to an illustration pump GUR Assemblage.
  2. Pump installation is made upside-down. Pay attention to following moments:
    • Adjust a tension приводного a pump belt, then tighten at first a bolt «A», and then a bolt «B» with demanded efforts;
    • Use a new lining of a delivery tube;
    • Make sure, that the stopper (1) delivery tubes (2) concerns скобы;
    • In summary pump over air from system GUR.